Strangler fig pattern: definition of the strangler fig migration pattern

Domain

Engineering

In brief

The strangler fig pattern is a way of replacing a legacy system in stages: a new system is built around the old one and takes over its functions one by one, until the old one can be switched off. The name comes from a metaphor by Martin Fowler, drawn from a fig that grows on a host tree.

Page contents

A fig and its host tree: the original image

The strangler fig pattern owes its name to a tree. In an article on his website (martinfowler.com, “Strangler Fig”, dated 22 August 2024, page checked on 12 November 2026), Martin Fowler recounts observing strangler figs in the forests of Queensland in 2001. The plant germinates in a crevice of a tree, draws its nutrients from the host, reaches the ground and the canopy, then becomes self-sustaining. The original tree may die, and the fig keeps its shape.

The author saw in this an analogy with the way his colleagues were modernising legacy software. His first post, kept on the site under the date of 29 June 2004, was titled “Strangler Application”. He explains that he later added the word “Fig” to the title: the shortened form “strangler” made people forget the botanical origin of the term and gave it a violent connotation.

Definition of the strangler fig pattern

The strangler fig pattern is the name given to the incremental modernisation of a legacy system. According to the article, it begins with small additions, for example new features, built on top of the old code but kept separate from it. Pieces of behaviour then move from the old system to the new code.

The pattern stands in contrast to wholesale replacement, whose pitfalls the author lists: the operation takes a long time while users are waiting for new features, the detail of existing behaviour is hard to establish, and part of that behaviour is no longer wanted.

Facade, seams and transitional architecture

  • The facade. The descriptions of the pattern published by Microsoft (Azure Architecture Center) and by AWS (Prescriptive Guidance), consulted on the same day, place in front of the old system a facade, or proxy, that intercepts requests and routes them to the old system or to the new one.
  • Seams. Martin Fowler’s article uses this name for the places where the system can be split into parts that can be replaced separately.
  • Transitional architecture. The same article uses this name for the code that makes the two systems coexist and that disappears once modernisation is complete.
  • Decommissioning. The old system is retired when nothing depends on it any more.

Strangler fig pattern, big-bang cutover, refactoring: not to be confused

A big-bang cutover replaces the old system in one go. The pattern spreads the replacement over stages, each of which puts part of the new system into service.

Refactoring changes the structure of code without changing its behaviour, within a single system. The pattern, for its part, keeps two systems running side by side and moves functions from one to the other.

Nor is the pattern a target architecture. AWS’s documentation presents it as a way of moving from a monolith to microservices; Martin Fowler’s article speaks more broadly of modernising legacy systems.

Illustration: an insurer’s claims management

Consider an insurer whose claims management application has to be replaced: a facade is placed in front of it and at first passes all requests through to it. Online claim reporting, a new feature, is built in the new system: the facade sends it the corresponding requests. Case tracking migrates next, then the calculation of settlements. When no request reaches the old application any more, it is switched off.

What the pattern costs, and the cases where it is a poor fit

Martin Fowler writes that this approach does not make the exercise easy: it makes the investment and its returns gradual and visible. The transitional architecture has a cost, which he considers offset by the reduction in risk and by value obtained earlier.

Microsoft’s documentation points out that the facade can become a single point of failure or a bottleneck. It also cites cases where the pattern is a poor fit, such as a small system that is simple to replace entirely.

Choosing this pattern among modernisation strategies, data coexistence and rollback for each stage are covered on our page on application modernisation.

FAQ

Frequently asked questions

Another question? Ask us

What does the strangler fig pattern consist of?

The strangler fig pattern is an incremental migration pattern. A new system is built alongside the old one and takes over its functions one by one, instead of replacing it in a single step. The old system is switched off when no function depends on it any more.

Where does the name strangler fig pattern come from?

The name strangler fig pattern comes from a metaphor by Martin Fowler. On his website, the author recounts seeing, in 2001, in the forests of Queensland, strangler figs that grow on a host tree until they take its place. His first post on the subject was titled "Strangler Application"; the word "Fig" was added to the title later, as a reminder of the botanical origin of the image.

What is the role of the facade in the strangler fig pattern?

In the descriptions of the strangler fig pattern published by Microsoft and by AWS, a facade, or proxy, intercepts requests intended for the old system. It routes each request to the old system or to the new one, depending on whether the function concerned has been migrated. Client applications thus keep the same interface during the migration.

In which cases is the strangler fig pattern not suitable?

Microsoft's architecture documentation cites several cases where the strangler fig pattern is a poor fit: requests to the old system cannot be intercepted, the system is small and simple to replace entirely, or it must be retired quickly. The pattern also assumes that the old system can stay in service for the duration of the migration.